Certificações oficiais Six Sigma

Perguntas de preparação para a certificação em testes de software

Estas perguntas são semelhantes às dos exames dos nossos programas: Accredited Software Tester Certification™, Accredited Software Test Manager Certification™, Accredited Software Test Automator Certification™.

Estude as perguntas e respostas da certificação que pretende obter e faça o exame com confiança.

Six Sigma and DMAIC Methodology OverviewA six-step practical process beside the DMAIC cycle. RECOGNIZE leads into DEFINE; DEFINE leads outward to REALIZE. No lines map individual left-hand process steps to right-hand phases.PracticalProblemUnderstand the problem thatimpacts businessperformanceStatisticalProblemIdentify the problem withdata and factsStatisticalSolutionFind out a data-driven andreliable solutionPracticalSolutionProvide a solution toincrease profit, reducewasteControl PlanCreate a system to sustaina long-term solutionResultsMeasure and reap thebenefits of financialsuccessesRECOGNIZEREALIZEDEFINEMEASUREANALYZEIMPROVECONTROLVOICE OFCUSTOMER&VOICE OFPROCESS
Abrir diagrama em tamanho real

General Six Sigma Questions

Pergunta 1 Neste exemplo, como se chama um erro quando é detetado por um testador e depois de ser confirmado por um programador?

  1. Defeito e bug
  2. Defeito e falha
  3. Falha e bug
  4. Falha e defeito
  5. Problema e bug

Resposta correta 5. Problema e bug

Pergunta 2 Coloque as etapas da revisão formal pela ordem em que ocorrem. (a) Planeamento, (b) correções, (c) reunião de revisão, (d) acompanhamento, (e) arranque, (f) preparação individual.

  1. Identify Vital Project X’s and statistically validate them
  2. Communicate & sign off to close Project
  3. Generate Potential Solutions & Assess Failure Mode
  4. all of the above
  5. none of the above

Resposta correta 1. Identify Vital Project X’s and statistically validate them

Pergunta 3 O que avaliam os testes não funcionais?

  1. Desempenho
  2. Usabilidade
  3. Que funcionalidades devem ser excluídas
  4. Todas as anteriores
  5. Opções 1 e 2

Resposta correta 4. Todas as anteriores

Pergunta 4 Que parte do plano de testes indica quando terminar os testes?

  1. Estratégia de testes
  2. Ambiente de testes
  3. Critérios de conclusão dos testes
  4. Objetivo dos testes
  5. Todas as anteriores

Resposta correta 2. Ambiente de testes

Pergunta 5 Por que motivo é importante realizar testes de integração?

  1. Para verificar se os testes unitários foram bem executados
  2. Para verificar se o sistema consegue ligar-se a outros sistemas na rede
  3. Para verificar como os módulos se encaixam e funcionam em conjunto
  4. Para verificar se o projeto foi bem dividido em módulos
  5. Para detetar erros de conceção

Resposta correta 1. Para verificar se os testes unitários foram bem executados

Pergunta 6 Que tarefa normalmente não faz parte das responsabilidades de um testador?

  1. Consultar um fornecedor para escolher a melhor ferramenta de testes
  2. Preparar dados de teste
  3. Criar casos de teste
  4. Comunicar defeitos
  5. Implementar testes a todos os níveis

Resposta correta 4. Comunicar defeitos

Pergunta 7 Que tipo de testes fazem os clientes nas suas próprias instalações?

  1. Testes beta
  2. Testes alfa
  3. Testes de caixa negra
  4. Testes de caixa branca
  5. Todas as anteriores

Resposta correta 2. Testes alfa

Pergunta 8 Que atividade gere alterações entre diferentes versões de um software?

  1. Gestão de alterações
  2. Gestão de produto
  3. Gestão empresarial
  4. Gestão de testes
  5. Gestão de configuração

Resposta correta 3. Gestão empresarial

Pergunta 9 O que ajuda um programador a decidir qual bug corrigir primeiro?

  1. Gravidade
  2. Prioridade
  3. Matriz de rastreabilidade
  4. Métricas de teste
  5. Métricas de processo

Resposta correta 4. Métricas de teste

Pergunta 10 Que informação é dispensável num relatório de incidentes de teste?

  1. Como reproduzir o defeito
  2. Detalhes do ambiente de teste
  3. Prioridade do defeito
  4. Como o defeito deve ser corrigido
  5. Gravidade do defeito

Resposta correta 1. Como reproduzir o defeito

Certified Six Sigma Yellow Belt Test Questions

Pergunta 11

  1. Conduct a Fishbone (Ishikawa) diagram analysis to identify potential root causes of defects.
  2. Initiate a Green Belt project to address the defect issue, as Yellow Belts typically don't lead projects.
  3. Define the problem more clearly by collecting additional data on when and where defects occur.
  4. Immediately implement process changes based on the existing data to reduce defects.
  5. Consult with top management to seek their input on the next steps to take in the project.

Resposta correta 3. Define the problem more clearly by collecting additional data on when and where defects occur.

Pergunta 12

  1. Ignore the resistance and proceed with the implementation as planned, as it's the best solution for the hospital.
  2. Hold training sessions for the employees to help them become proficient with the new system and address their concerns.
  3. Terminate the employees who resist the implementation to send a strong message to the rest of the team.
  4. Seek approval from the hospital's board of directors before proceeding with any changes to the registration process.
  5. Revert to the old paper-based system to avoid conflicts and maintain employee satisfaction.

Resposta correta 2. Hold training sessions for the employees to help them become proficient with the new system and address their concerns.

Pergunta 13

  1. Implement process changes immediately without further analysis to address the identified issues.
  2. Hold a brainstorming session with the project team to generate ideas for process improvements based on the identified themes.
  3. Ignore the data and continue with the current customer service processes, as they have been in place for years.
  4. Perform a root cause analysis to understand the underlying factors contributing to the identified issues and prioritize improvements accordingly.
  5. Hire a customer service consultant to make recommendations based on the data findings.

Resposta correta 4. Perform a root cause analysis to understand the underlying factors contributing to the identified issues and prioritize improvements accordingly.

Pergunta 14

  1. Randomly select one factor to focus on and start the improvement process with it.
  2. Use a cause-and-effect diagram (Ishikawa or Fishbone diagram) to visualize the potential causes and their relationships.
  3. Focus solely on operator training, as it's the most common cause of defects in manufacturing processes.
  4. Conduct a survey of all employees to gather their opinions on which factor to address first.
  5. Prioritize based on the cost of implementing improvements for each factor, starting with the most cost-effective one.

Resposta correta 2. Use a cause-and-effect diagram (Ishikawa or Fishbone diagram) to visualize the potential causes and their relationships.

Pergunta 15

  1. Run a regression analysis on the collected data to identify the most significant factors affecting customer satisfaction.
  2. Use a control chart to monitor and control the order fulfillment process and reduce defects in real-time.
  3. Implement a Voice of the Customer (VOC) survey to collect customer feedback on their preferences and satisfaction with the order fulfillment process.
  4. Engage with the company's employees to gather their insights on customer preferences and expectations.
  5. Increase the number of quality checks in the order fulfillment process to ensure that orders meet customer expectations.

Resposta correta 3. Implement a Voice of the Customer (VOC) survey to collect customer feedback on their preferences and satisfaction with the order fulfillment process.

Pergunta 16

  1. Implement a Total Quality Management (TQM) system to address various aspects of the organization's quality issues.
  2. Conduct a series of brainstorming sessions with the pharmacy team to generate ideas for improvement.
  3. Use a Failure Mode and Effects Analysis (FMEA) to prioritize potential failure modes and their impacts on the medication process.
  4. Implement a visual management system in the pharmacy to increase transparency and reduce errors.
  5. Develop a detailed project plan using the DMAIC (Define, Measure, Analyze, Improve, Control) methodology to address the identified issues systematically.

Resposta correta 5. Develop a detailed project plan using the DMAIC (Define, Measure, Analyze, Improve, Control) methodology to address the identified issues systematically.

Pergunta 17

  1. Implement an automated data entry system to eliminate errors and streamline the order processing process.
  2. Request faster response times from suppliers without making any changes to the internal processes.
  3. Hold a team meeting to discuss the identified issues and brainstorm solutions to address the bottlenecks.
  4. Implement a Just-In-Time (JIT) inventory system to reduce the reliance on suppliers for order processing.
  5. Conduct a Value Stream Mapping (VSM) analysis to identify waste and inefficiencies in the order processing process and create a plan for improvement.

Resposta correta 5. Conduct a Value Stream Mapping (VSM) analysis to identify waste and inefficiencies in the order processing process and create a plan for improvement.

Pergunta 18

  1. Hire additional staff to expedite the credit check process and reduce delays.
  2. Introduce a new software tool for the credit check process without analyzing its impact on existing operations.
  3. Streamline the credit check process by identifying and eliminating non-value-added steps and inefficiencies.
  4. Outsource the credit check process to a third-party company to reduce the workload on the internal team.
  5. Implement a new policy that prioritizes certain loan applications and fast-tracks them through the credit check stage.

Resposta correta 3. Streamline the credit check process by identifying and eliminating non-value-added steps and inefficiencies.

Pergunta 19

  1. Use a control chart to monitor defects and react to any variations during production.
  2. Implement a Just-In-Time (JIT) production system to minimize the impact of variations in raw materials.
  3. Conduct a Failure Mode and Effects Analysis (FMEA) to prioritize and address the factors contributing to defects systematically.
  4. Hire a consultant to assess and recommend improvements in machine calibration and operator training.
  5. Implement a Total Quality Management (TQM) system to address various aspects of the manufacturing process simultaneously.

Resposta correta 3. Conduct a Failure Mode and Effects Analysis (FMEA) to prioritize and address the factors contributing to defects systematically.

Pergunta 20

  1. Install more self-check-in kiosks to reduce wait times and automate the process.
  2. Require all employees to complete a customer service training program to enhance their interactions with guests during check-in.
  3. Introduce a loyalty program that provides personalized perks to repeat guests, addressing the lack of personalization.
  4. Streamline the check-in process by identifying and eliminating non-value-added steps and paperwork errors.
  5. Outsource the entire guest check-in process to a third-party company to reduce in-house workload.

Resposta correta 4. Streamline the check-in process by identifying and eliminating non-value-added steps and paperwork errors.

Certified Six Sigma Green Belt Test Questions

Pergunta 21

  1. Define
  2. Measure
  3. Analyze
  4. Improve
  5. Control

Resposta correta 4. Improve

Pergunta 22

  1. Define
  2. Measure
  3. Analyze
  4. Improve
  5. Control

Resposta correta 3. Analyze

Pergunta 23

  1. Pareto Chart
  2. Fishbone Diagram (Ishikawa)
  3. Regression Analysis
  4. 5 Whys Analysis
  5. Process Mapping

Resposta correta 3. Regression Analysis

Pergunta 24

  1. Identify potential root causes of the problem.
  2. Implement and sustain the improvements made during the project.
  3. Analyze data to uncover patterns and trends.
  4. Set project goals and objectives.
  5. Collect baseline data to measure process performance.

Resposta correta 2. Implement and sustain the improvements made during the project.

Pergunta 25

  1. Continue collecting data but do not take any further action.
  2. Implement additional changes to see if further improvements can be made.
  3. Monitor the process to ensure the improvements are sustained and address any deviations from the new standard (standard deviation).
  4. Conduct a new root cause analysis to identify other potential improvements.
  5. Discontinue the project as the improvements have been made.

Resposta correta 3. Monitor the process to ensure the improvements are sustained and address any deviations from the new standard (standard deviation).

Pergunta 26

  1. Collect additional data to analyze the waiting times further.
  2. Train the emergency department staff on the new process changes.
  3. Monitor and sustain the improvements in patient waiting times over time.
  4. Conduct a new root cause analysis to identify additional issues.
  5. Discontinue the project as the waiting times have improved.

Resposta correta 3. Monitor and sustain the improvements in patient waiting times over time.

Pergunta 27

  1. Document the process changes but do not implement any control measures.
  2. Set new project goals to aim for further improvements.
  3. Implement control measures to monitor the process and sustain the measurement improvements.
  4. Move on to another project to maximize the benefits of Six Sigma.
  5. Conduct a final analysis and report the project's success.

Resposta correta 3. Implement control measures to monitor the process and sustain the measurement improvements.

Pergunta 28

  1. Discontinue the project as the improvements have been made.
  2. Train the customer support team in new procedures to handle returns.
  3. Monitor key performance indicators related to the return process to ensure ongoing improvement.
  4. Initiate a new project to address a different aspect of customer satisfaction.
  5. Document the improvements made in a final report for management.

Resposta correta 3. Monitor key performance indicators related to the return process to ensure ongoing improvement.

Pergunta 29

  1. Conduct a new root cause analysis to explore additional issues affecting product quality.
  2. Train the production team on the newly implemented quality control measures.
  3. Monitor and measure key quality indicators to ensure that the improvements are maintained.
  4. Discontinue the project as the initial improvements have been made.
  5. Implement additional changes to further optimize product quality.

Resposta correta 3. Monitor and measure key quality indicators to ensure that the improvements are maintained.

Pergunta 30

  1. Conduct a new root cause analysis to explore other factors contributing to billing errors.
  2. Train the billing team on the new procedures and quality control measures.
  3. Monitor key performance indicators related to billing errors to ensure sustained improvements.
  4. Discontinue the project as initial improvements have been made.
  5. Implement additional changes to further optimize the billing process.

Resposta correta 3. Monitor key performance indicators related to billing errors to ensure sustained improvements.

Certified Six Sigma Black Belt Test Questions

Pergunta 31

  1. Control Chart
  2. Fishbone Diagram
  3. Value Stream Mapping
  4. Brainstorming
  5. 5 Whys Analysis

Resposta correta 1. Control Chart

Pergunta 32

  1. SIPOC Diagram
  2. Scatter Plot
  3. Control Chart
  4. Pareto Chart
  5. Regression Analysis

Resposta correta 4. Pareto Chart

Pergunta 33

  1. Chi-Square Test
  2. One-Way ANOVA
  3. T-Test
  4. Regression Analysis
  5. Fishbone Diagram

Resposta correta 3. T-Test

Pergunta 34

  1. Identify the causes of defects in the software development process.
  2. Rank potential failure modes based on their impact and likelihood.
  3. Create a detailed process map of the software development process.
  4. Collect data on the defect rate in the software development process.
  5. Define the critical-to-quality characteristics of the software.

Resposta correta 2. Rank potential failure modes based on their impact and likelihood.

Pergunta 35

  1. Process Map
  2. Brainstorming
  3. Quality Function Deployment (QFD)
  4. Check Sheet
  5. Scatter Plot

Resposta correta 3. Quality Function Deployment (QFD)

Pergunta 36

  1. Define
  2. Measure
  3. Analyze
  4. Improve
  5. Control

Resposta correta 4. Improve

Pergunta 37

  1. Pareto Chart
  2. Value Stream Mapping
  3. Scatter Plot
  4. Failure Mode and Effects Analysis (FMEA)
  5. Control Chart

Resposta correta 1. Pareto Chart

Pergunta 38

  1. Regression Analysis
  2. Chi-Square Test
  3. Analysis of Variance (ANOVA)
  4. Control Chart
  5. Histogram

Resposta correta 3. Analysis of Variance (ANOVA)

Pergunta 39

  1. SIPOC Diagram
  2. Control Chart
  3. Scatter Plot
  4. Value Stream Mapping
  5. Pareto Chart

Resposta correta 3. Scatter Plot

Pergunta 40

  1. Hold regular project review meetings to monitor progress.
  2. Update the project charter with new goals and objectives.
  3. Implement a control plan and continue to collect and analyze data.
  4. Conduct additional training for team members on the improved process.
  5. Archive all project documents for historical reference.

Resposta correta 3. Implement a control plan and continue to collect and analyze data.

Certified Six Sigma Master Black Belt Test Questions

Pergunta 41

  1. John can conclude that the process is not capable, and he should focus on reducing variability within the process to meet customer requirements.
  2. John can conclude that the process is highly capable, and there is no need for process improvement efforts.
  3. John should focus on increasing the process capability index (Cp) to at least 2.0, which is considered the industry standard for capability.
  4. John should consult with the customers to see if their requirements can be relaxed, given the current process capability indices.
  5. John should ignore the process capability indices and proceed to the Analyze phase of the project.

Resposta correta 1. John can conclude that the process is not capable, and he should focus on reducing variability within the process to meet customer requirements.

Pergunta 42

  1. Process Capability Analysis and FMEA (Failure Mode and Effects Analysis).
  2. Fishbone Diagram (Ishikawa) and 5 Whys Analysis.
  3. Control Charts and ANOVA (Analysis of Variance).
  4. Pareto Chart and Hypothesis Testing (e.g., t-test).
  5. Value Stream Mapping and Kaizen events.

Resposta correta 5. Value Stream Mapping and Kaizen events.

Pergunta 43

  1. Daniel should focus on operator training as the primary root cause and initiate training programs to reduce defects.
  2. Daniel should address all three root causes simultaneously to ensure a comprehensive improvement of the process.
  3. Daniel should prioritize the root causes based on their potential impact and ease of implementation, and address them one by one.
  4. Daniel should disregard the root causes and look for quick fixes to reduce defects in the short term.
  5. Daniel should consult with an external expert to make the final decision on which root cause to address first.

Resposta correta 3. Daniel should prioritize the root causes based on their potential impact and ease of implementation, and address them one by one.

Pergunta 44

  1. Customer Service Representative, IT Specialist, and Data Analyst.
  2. Project Sponsor, Green Belt, and Customer Liaison.
  3. Project Champion, Process Owner, and Project Manager.
  4. Yellow Belt, Black Belt, and Master Black Belt.
  5. Team Lead, Subject Matter Expert, and Statistician.

Resposta correta 3. Project Champion, Process Owner, and Project Manager.

Pergunta 45

  1. Ignore the VOC data and focus solely on reducing cycle time to meet internal goals.
  2. Conduct a detailed analysis to identify areas where cycle time can be reduced without compromising the quality of credit checks.
  3. Increase the number of credit checks to ensure thoroughness, even if it results in longer cycle times.
  4. Meet with customers to explain the challenges in balancing speed and thorough credit checks and ask for their input on potential trade-offs.
  5. Delegate the responsibility for making this decision to the project team without further involvement from customers.

Resposta correta 4. Meet with customers to explain the challenges in balancing speed and thorough credit checks and ask for their input on potential trade-offs.

Pergunta 46

  1. Cost of implementing the improvements, impact on cycle time, and potential increase in product quality.
  2. Employee satisfaction, market trends, and supplier performance.
  3. Current market share, customer loyalty, and historical sales data.
  4. Weather conditions, global economic factors, and employee turnover rate.
  5. Projected revenue, project team's morale, and the availability of new technology.

Resposta correta 1. Cost of implementing the improvements, impact on cycle time, and potential increase in product quality.

Pergunta 47

  1. Pareto Chart.
  2. Control Chart (e.g., X-bar and R chart).
  3. Scatter Plot.
  4. Failure Mode and Effects Analysis (FMEA).
  5. Box and Whisker Plot.

Resposta correta 2. Control Chart (e.g., X-bar and R chart).

Pergunta 48

  1. Ignore the resistance and proceed with the changes as planned, assuming team members will adapt over time.
  2. Communicate the benefits of the changes and involve the resistant team members in the decision-making process to address their concerns.
  3. Replace the resistant team members with more cooperative individuals to avoid delays in implementation.
  4. Abandon the changes and revert to the previous process to maintain team harmony and avoid conflicts.
  5. Hold a team meeting and ask for volunteers to take on the responsibility of implementing the changes despite resistance.

Resposta correta 2. Communicate the benefits of the changes and involve the resistant team members in the decision-making process to address their concerns.

Pergunta 49

  1. Address all factors simultaneously to ensure a comprehensive approach to reducing defects.
  2. Conduct a survey of the team members to gather their opinions on the most critical factors and prioritize accordingly.
  3. Use a Fishbone Diagram to visually represent the factors and their potential impact, then prioritize based on the Pareto principle.
  4. Randomly select one factor for improvement to maintain the project's agility and flexibility in addressing defects.
  5. Prioritize the factors based on statistical analysis and data-driven methods, such as Design of Experiments (DOE).

Resposta correta 5. Prioritize the factors based on statistical analysis and data-driven methods, such as Design of Experiments (DOE).

Pergunta 50

  1. Implement regular training sessions for call center agents to address any performance decline.
  2. Establish Key Performance Indicators (KPIs) to monitor call center efficiency and conduct monthly reviews to identify any deviations.
  3. Introduce performance-based incentives for call center agents to maintain their motivation and productivity.
  4. Create a suggestion system to encourage call center agents to provide continuous improvement ideas and incentives for the best suggestions.
  5. Conduct quarterly audits of the call center processes and make necessary adjustments based on audit findings.

Resposta correta 2. Establish Key Performance Indicators (KPIs) to monitor call center efficiency and conduct monthly reviews to identify any deviations.

Certified Six Sigma Champion Test Questions

Pergunta 51

  1. You should immediately approve the purchase of new machines as a solution to the problem.
  2. You should request a cost-benefit analysis to ensure that investing in new machines is justified.
  3. You should instruct the team to start machine calibration more frequently to reduce defects.
  4. You should ask the team to explore alternative solutions, such as improving the existing calibration process.
  5. You should consult with the production team and make a decision based on their preferences.

Resposta correta 2. You should request a cost-benefit analysis to ensure that investing in new machines is justified.

Pergunta 52

  1. Direct the team to continue addressing process-related issues, as employee morale and training are not within the scope of this project.
  2. Expand the project scope to include employee morale and training as critical factors in defect reduction.
  3. Bring in a separate team to focus on employee morale and training issues while the current team continues to work on process improvements.
  4. Conduct a comprehensive analysis to determine the extent to which employee morale and training impact the defect rate and then decide on the appropriate course of action.
  5. Ignore the employee morale and training issues, as they are not relevant to Six Sigma projects.

Resposta correta 4. Conduct a comprehensive analysis to determine the extent to which employee morale and training impact the defect rate and then decide on the appropriate course of action.

Pergunta 53

  1. Ignore the resistance and focus on achieving project goals, as employee concerns are a secondary consideration.
  2. Engage in one-on-one discussions with the resistant employees to address their concerns and seek their input on process improvements.
  3. Implement the changes without informing the employees to avoid unnecessary resistance.
  4. Terminate the resistant employees and hire new ones who are more open to process improvements.
  5. Hold a town hall meeting to communicate the project's goals, benefits, and the company's commitment to employee welfare.

Resposta correta 5. Hold a town hall meeting to communicate the project's goals, benefits, and the company's commitment to employee welfare.

Pergunta 54

  1. Disregard the concerns of healthcare professionals and proceed with the project to meet the established timelines.
  2. Engage in individual conversations with resistant healthcare professionals to better understand their concerns and involve them in the improvement process.
  3. Implement the changes without informing healthcare professionals, as the project's goals are more important than individual concerns.
  4. Replace the resistant healthcare professionals with those who are more open to process improvements.
  5. Hold a series of team meetings to discuss the project's goals, share data on the impact of waiting times, and collaborate on solutions that address both patient care quality and reduced waiting times.

Resposta correta 5. Hold a series of team meetings to discuss the project's goals, share data on the impact of waiting times, and collaborate on solutions that address both patient care quality and reduced waiting times.

Pergunta 55

  1. Ignore the potential job losses and proceed with the supplier change to achieve cost savings.
  2. Conduct a cost-benefit analysis that includes the impact on both companies and explores alternatives to minimize job losses.
  3. Immediately terminate the contract with the current supplier and switch to the new one to save costs.
  4. Avoid discussing the potential job losses and focus on the financial benefits for your company.
  5. Hold a meeting with representatives from both companies to discuss the situation openly and explore ways to minimize the impact on jobs.

Resposta correta 2. Conduct a cost-benefit analysis that includes the impact on both companies and explores alternatives to minimize job losses.

Pergunta 56

  1. Disregard the concerns and assume that the process changes will continue to be effective.
  2. Hold a meeting with the team to review the data and celebrate the initial success of the project.
  3. Ask the team to document the process changes and create a plan for ongoing monitoring and control.
  4. Terminate the project, as the initial defect reduction demonstrates its success.
  5. Encourage the team to be vigilant and continue monitoring the process to prevent regressions and further improvements.

Resposta correta 3. Ask the team to document the process changes and create a plan for ongoing monitoring and control.

Pergunta 57

  1. Allocate the entire budget and resources to the implementation of the new software, as it is the most critical improvement area.
  2. Implement all identified improvements simultaneously to expedite the project's completion.
  3. Conduct a cost-benefit analysis to determine the potential impact and return on investment for each improvement area and prioritize accordingly.
  4. Delay the project until additional budget and resources become available to address all identified improvement areas.
  5. Assign the highest-priority improvement area based on the project team's recommendations.

Resposta correta 3. Conduct a cost-benefit analysis to determine the potential impact and return on investment for each improvement area and prioritize accordingly.

Pergunta 58

  1. Ignore the resistance and focus on implementing the new process, as it is more efficient.
  2. Terminate the employment of the resistant employees to remove obstacles to change.
  3. Engage in one-on-one discussions with the resistant employees to understand their concerns and provide training on the new process.
  4. Conduct a thorough change management plan that involves communication, training, and involvement of employees in the process redesign.
  5. Ignore the resistance and proceed with the project, expecting that employees will adapt over time.

Resposta correta 4. Conduct a thorough change management plan that involves communication, training, and involvement of employees in the process redesign.

Pergunta 59

  1. Ignore the staff shortage issue and focus on other root causes to avoid additional complexities.
  2. Engage in one-on-one discussions with the management to request additional staff during peak hours.
  3. Terminate the project, as addressing the staff shortage is beyond the scope of the project.
  4. Work with the project team to analyze the impact of staff shortage on waiting times and determine the feasibility of adding temporary staff during peak hours.
  5. Continue the project and hope that process improvements alone will resolve the waiting time issue.

Resposta correta 4. Work with the project team to analyze the impact of staff shortage on waiting times and determine the feasibility of adding temporary staff during peak hours.

Pergunta 60

  1. Implement a standardized development process without consulting the project team, as it will save time and resources.
  2. Terminate the project, as standardizing the development process is beyond the project's scope.
  3. Conduct a meeting with the project team to collaboratively develop and implement a standardized development process.
  4. Ignore the issue and focus on identifying and fixing defects in the software products as they arise.
  5. Assign the task of standardizing the development process to a separate team, independent of the project team, to ensure objectivity.

Resposta correta 3. Conduct a meeting with the project team to collaboratively develop and implement a standardized development process.

Certified Six Sigma Deployment Leader Test Questions

Pergunta 61

  1. John should immediately approve the budget for the new equipment to address the bottleneck.
  2. John should consult with the company's financial team to assess the ROI of investing in the new equipment and present a data-driven proposal to the management.
  3. John should wait for senior management to initiate such investments without his involvement.
  4. John should request an extension of the project timeline until the budget for the new equipment is approved.
  5. John should inform the team to continue data collection without addressing the bottleneck until a future phase of the project.

Resposta correta 2. John should consult with the company's financial team to assess the ROI of investing in the new equipment and present a data-driven proposal to the management.

Pergunta 62

  1. A list of all the project team members' academic qualifications and certifications.
  2. A high-level project timeline with milestones and deadlines for each phase of DMAIC.
  3. Details about the company's annual budget and revenue projections for the year.
  4. A brief description of the team's preferred communication tools and methods.
  5. A clear problem statement, project scope, objectives, and expected outcomes of the Six Sigma project.

Resposta correta 5. A clear problem statement, project scope, objectives, and expected outcomes of the Six Sigma project.

Pergunta 63

  1. Immediately implementing all identified process improvements without testing or validation.
  2. Conducting a pilot test of the proposed process improvements with a small, representative group of team members.
  3. Continuing data collection and analysis to identify additional root causes and potential improvements.
  4. Documenting the current process extensively, regardless of whether it aligns with the proposed improvements.
  5. Seeking approval from senior management for a significant increase in the project budget to fund all proposed improvements.

Resposta correta 2. Conducting a pilot test of the proposed process improvements with a small, representative group of team members.

Pergunta 64

  1. Brainstorming sessions with the project team to gather their opinions on which improvements are most important.
  2. Implement all identified improvements simultaneously to address every issue at once.
  3. Use a Failure Modes and Effects Analysis (FMEA) to assess the impact and probability of success for each improvement.
  4. Consult with the hospital's board of directors to get their input on which improvements to prioritize.
  5. Assign priorities based on the cost of implementing each improvement, starting with the least expensive ones first.

Resposta correta 3. Use a Failure Modes and Effects Analysis (FMEA) to assess the impact and probability of success for each improvement.

Pergunta 65

  1. Select the solution that requires the least financial investment, even if it has a lower probability of success.
  2. Choose the solution that team members prefer the most, as it will boost morale and motivation.
  3. Base the decision on data and statistical analysis, selecting the solution with the highest likelihood of reducing defects effectively.
  4. Opt for the solution that aligns with the company's latest strategic initiatives, regardless of its impact on defect reduction.
  5. Consult with external industry experts to get their opinion on which solution to choose.

Resposta correta 3. Base the decision on data and statistical analysis, selecting the solution with the highest likelihood of reducing defects effectively.

Pergunta 66

  1. Immediately implement process changes based on the data collected without consulting employees.
  2. Hold a series of training sessions for employees to ensure they follow a standardized onboarding process.
  3. Conduct a Root Cause Analysis (RCA) to identify the underlying causes of variations in employee performance.
  4. Recommend replacing the entire onboarding team with new employees who can follow a standardized process more effectively.
  5. Consult with senior management to get their opinion on which step to take next.

Resposta correta 3. Conduct a Root Cause Analysis (RCA) to identify the underlying causes of variations in employee performance.

Pergunta 67

  1. Assign each team member to investigate one potential cause separately and report back in the next team meeting.
  2. Immediately implement changes to address all potential causes to see which one works best in practice.
  3. Conduct further data analysis and statistical tests to determine which potential cause has the most significant impact on inventory issues.
  4. Consult with external industry experts to get their opinion on which potential cause to address first.
  5. Request additional budget from senior management to address all potential causes simultaneously to avoid any delays in the project.

Resposta correta 3. Conduct further data analysis and statistical tests to determine which potential cause has the most significant impact on inventory issues.

Pergunta 68

  1. To provide data for performance evaluations of the production line workers.
  2. To justify the need for replacing the current workforce with more skilled employees.
  3. To facilitate regular audits by external quality assurance agencies.
  4. To ensure that the improved production process maintains a stable and predictable level of quality and performance.
  5. To gather data for marketing purposes to show customers that the product line is improving.

Resposta correta 4. To ensure that the improved production process maintains a stable and predictable level of quality and performance.

Pergunta 69

  1. To assign blame to individual team members responsible for defects in software releases.
  2. To increase the workload on software developers to ensure they are more cautious in their work.
  3. To reduce the need for software testing and quality assurance activities, saving time and resources.
  4. To identify and prevent defects in software releases, improving the overall quality and reliability of the software.
  5. To justify the need for outsourcing software development to third-party vendors with a better track record.

Resposta correta 4. To identify and prevent defects in software releases, improving the overall quality and reliability of the software.

Pergunta 70

  1. To identify employees who are not following the new routing and scheduling processes and reprimand them for non-compliance.
  2. To collect data for marketing purposes to demonstrate to customers that the company's delivery services have improved.
  3. To justify further cost-cutting measures, such as reducing the number of delivery trucks and drivers, to save additional money.
  4. To ensure that the new routing and scheduling processes are consistently followed and that any deviations can be quickly addressed to maintain efficiency and cost savings.
  5. To measure the performance of the newly implemented processes once and report the results to senior management for evaluation.

Resposta correta 4. To ensure that the new routing and scheduling processes are consistently followed and that any deviations can be quickly addressed to maintain efficiency and cost savings.

Certified Six Sigma Trainer Test Questions

Pergunta 71

  1. Alex should spend extra time explaining Control Charts to Sarah, using real-life examples from her role.
  2. Alex should tell Sarah to research Control Charts on her own time if she wants to understand their relevance.
  3. Alex should skip the topic of Control Charts to keep the training on schedule.
  4. Alex should ask another team member to explain Control Charts to Sarah since they might understand better.
  5. Alex should ignore Sarah's concerns and continue with the training as planned.

Resposta correta 1. Alex should spend extra time explaining Control Charts to Sarah, using real-life examples from her role.

Pergunta 72

  1. Emily should agree with Tom and emphasize that Six Sigma is overly reliant on statistics.
  2. Emily should suggest that Tom considers other quality improvement methodologies that are less data-driven.
  3. Emily should offer to provide additional resources and support to help Tom improve his statistical analysis skills.
  4. Emily should encourage the rest of the group to share their perspectives on the importance of data analysis in Six Sigma projects.
  5. Emily should ignore Tom's concerns and continue with the planned training agenda without addressing the issue.

Resposta correta 3. Emily should offer to provide additional resources and support to help Tom improve his statistical analysis skills.

Pergunta 73

  1. Jessica should encourage Mark to stick with the DMAIC approach, as it's a standard in Six Sigma, and other approaches may not be as effective.
  2. Jessica should insist that Mark follows the DMAIC approach but also encourages participants to explore other approaches in their free time.
  3. Jessica should allow teams to choose the approach they believe is most suitable for their specific projects and provide guidance and resources for various methodologies.
  4. Jessica should assign Mark to a project that explicitly requires the DMAIC approach to resolve the issue.
  5. Jessica should ignore Mark's insistence and let the teams decide on their project approaches independently.

Resposta correta 3. Jessica should allow teams to choose the approach they believe is most suitable for their specific projects and provide guidance and resources for various methodologies.

Pergunta 74

  1. Lisa should agree with Peter and suggest that Control Plans are often unnecessary and can be skipped in some cases.
  2. Lisa should recommend that Peter's organization should only implement Control Plans for high-impact projects to save time and resources.
  3. Lisa should explain the importance of Control Plans in sustaining improvements and preventing the regression of the process, highlighting their value in the long term.
  4. Lisa should suggest that Peter discusses his concerns with his organization's leadership and follows their guidance on whether to use Control Plans or not.
  5. Lisa should ignore Peter's concerns and continue with the training as planned, focusing on the standard Six Sigma process steps.

Resposta correta 3. Lisa should explain the importance of Control Plans in sustaining improvements and preventing the regression of the process, highlighting their value in the long term.

Pergunta 75

  1. Advise the team to follow Sarah's suggestion and create a Fishbone Diagram to identify potential causes of defects.
  2. Recommend that the team uses both tools, starting with a Fishbone Diagram to identify potential causes and then using FMEA to assess the criticality of each cause.
  3. Suggest that the team discusses the advantages and disadvantages of both tools and makes a collaborative decision on which one to use based on the specific context of the project.
  4. Support Tom's preference for FMEA and guide the team to use this method exclusively, as it's more comprehensive than the Fishbone Diagram.
  5. Ignore the team's debate and make the decision yourself, opting for one of the methods based on your personal preference as the Trainer.

Resposta correta 3. Suggest that the team discusses the advantages and disadvantages of both tools and makes a collaborative decision on which one to use based on the specific context of the project.

Pergunta 76

  1. Ignore the disengaged participants and focus on those who are actively participating to keep the training on schedule.
  2. Publicly call out the disengaged participants to encourage their participation and make them feel accountable for their involvement.
  3. Have a one-on-one conversation with each disengaged participant to understand their concerns and tailor the training to their needs.
  4. Implement interactive activities and exercises that require active participation, encouraging all participants to get involved in the discussions.
  5. Conclude the training session early since the disengaged participants may not be receptive to the material, and it's best not to waste time on them.

Resposta correta 4. Implement interactive activities and exercises that require active participation, encouraging all participants to get involved in the discussions.

Pergunta 77

  1. Agree with Mary and suggest that Lean principles may not be applicable in all situations, making them optional for process improvement.
  2. Ask Mary to provide specific examples from her organization's processes to demonstrate why she believes Lean principles are irrelevant, and then discuss each example individually.
  3. Explain the fundamental Lean principles and their benefits, using real-life case studies and examples to illustrate their applicability in various industries and situations.
  4. Suggest that Mary conducts additional research on Lean principles on her own time to gain a better understanding of their potential benefits.
  5. Ignore Mary's objections and continue with the training, focusing on the standard curriculum without addressing her concerns.

Resposta correta 3. Explain the fundamental Lean principles and their benefits, using real-life case studies and examples to illustrate their applicability in various industries and situations.

Pergunta 78

  1. Agree with John and suggest that SPC is outdated, making it optional for modern manufacturing processes.
  2. Invite John to share his thoughts on how modern manufacturing processes have evolved and discuss whether SPC can be adapted to address the changing needs of the industry.
  3. Explain the foundational principles of SPC and how it can be adapted to modern manufacturing, providing examples of successful implementations in automated and digitized environments.
  4. Suggest that John research alternative methodologies to SPC that may be more suitable for modern manufacturing and share his findings with the group.
  5. Ignore John's objections and continue with the training, following the standard curriculum without addressing his concerns.

Resposta correta 3. Explain the foundational principles of SPC and how it can be adapted to modern manufacturing, providing examples of successful implementations in automated and digitized environments.

Pergunta 79

  1. Politely request that Sarah save her questions and comments for designated Q&A sessions to ensure the training stays on track.
  2. Allow Sarah to continue with her questions and comments, as it's important to address participants' queries promptly to keep them engaged.
  3. Ask the rest of the group how they feel about Sarah's interruptions and follow their consensus on whether to address her behavior or not.
  4. Reprimand Sarah publicly to deter her from further interruptions and maintain the training's structure and focus.
  5. Ignore Sarah's interruptions and continue with the training, allowing her to interject as she sees fit without addressing the issue.

Resposta correta 1. Politely request that Sarah save her questions and comments for designated Q&A sessions to ensure the training stays on track.

Pergunta 80

  1. Agree with the participants and suggest that Green Belt projects are resource-intensive and may not be worth the investment for every organization.
  2. Advocate for the importance of Green Belt projects and recommend that organizations prioritize allocating resources to them for long-term process improvement benefits.
  3. Encourage the participants to discuss their concerns with their organization's leadership and seek their guidance on the allocation of resources for Green Belt projects.
  4. Provide examples of organizations that have successfully implemented Green Belt projects and demonstrate the return on investment and process improvements achieved through these projects.
  5. Ignore the participants' concerns and continue with the training, following the standard curriculum without addressing their questions about resource allocation.

Resposta correta 4. Provide examples of organizations that have successfully implemented Green Belt projects and demonstrate the return on investment and process improvements achieved through these projects.

Certified Six Sigma Coach Test Questions

Pergunta 81

  1. Engage in one-on-one discussions with the resistant workers to understand their concerns, address their fears, and involve them in the improvement process.
  2. Ignore the resistance and focus on implementing the project plan as initially designed to meet the project deadlines.
  3. Conduct a series of training sessions for all workers, emphasizing the benefits of the Six Sigma improvements and how it will positively impact their jobs and the company.
  4. Replace the resistant workers with more cooperative individuals to ensure the project's success and adherence to the Six Sigma principles.
  5. Convene a meeting with top management to convince them to force the resistant workers to comply with the Six Sigma changes for the greater good of the company.

Resposta correta 1. Engage in one-on-one discussions with the resistant workers to understand their concerns, address their fears, and involve them in the improvement process.

Pergunta 82

  1. Implement the changes without seeking the input of the medical staff, as the improvements are data-driven and evidence-based.
  2. Hold a meeting with the medical staff to explain the changes and their positive impact on patient care and ER efficiency, while also listening to their concerns and suggestions.
  3. Escalate the issue to hospital management and request that they enforce the changes, even if it means overruling the medical staff's objections.
  4. Provide additional training to the medical staff on the Six Sigma methodology and tools, emphasizing the benefits of process improvement in healthcare.
  5. Replace the medical staff with individuals who are more open to change and Six Sigma principles to ensure compliance with the improvement plan.

Resposta correta 2. Hold a meeting with the medical staff to explain the changes and their positive impact on patient care and ER efficiency, while also listening to their concerns and suggestions.

Pergunta 83

  1. Implement a top-down approach where you create standardized inventory management procedures and enforce them across all retail locations without seeking input from local store managers.
  2. Collaborate with local store managers to develop standardized inventory management processes that take into account the unique challenges and needs of each location.
  3. Replace the store managers with individuals who are more inclined to follow standardized processes and guidelines without question.
  4. Hold additional training sessions for store managers to educate them on the benefits of Six Sigma and the importance of standardized inventory control procedures.
  5. Report the issues to the executive team and recommend closing down underperforming retail locations to reduce the complexity of inventory management.

Resposta correta 2. Collaborate with local store managers to develop standardized inventory management processes that take into account the unique challenges and needs of each location.

Pergunta 84

  1. Implement a top-down directive to enforce communication protocols between the loan processing team and the customer service team, without seeking their input or involvement.
  2. Facilitate regular meetings and collaboration between the loan processing and customer service teams to establish clear communication channels, share feedback, and jointly develop effective communication procedures.
  3. Replace team members who are responsible for communication with individuals who are more inclined to follow established procedures without question.
  4. Organize a training program for team members, highlighting the importance of Six Sigma principles in the loan approval process, and emphasizing the need for clear communication practices.
  5. Report the issues to senior management and recommend outsourcing the customer service function to a third-party company to remove the communication burden from the loan processing team.

Resposta correta 2. Facilitate regular meetings and collaboration between the loan processing and customer service teams to establish clear communication channels, share feedback, and jointly develop effective communication procedures.

Pergunta 85

  1. Implement strict rules and procedures that require the development and testing teams to communicate and collaborate, with penalties for non-compliance.
  2. Organize regular joint meetings between the development and testing teams to encourage open communication, sharing of feedback, and mutual problem-solving, and jointly develop effective collaboration practices.
  3. Replace team members in both teams who are resistant to collaboration and have a history of poor communication.
  4. Hold mandatory training sessions for team members on Six Sigma principles and the significance of cross-functional collaboration in software development.
  5. Report the issues to senior management and suggest outsourcing the testing function to an external company to avoid internal collaboration challenges.

Resposta correta 2. Organize regular joint meetings between the development and testing teams to encourage open communication, sharing of feedback, and mutual problem-solving, and jointly develop effective collaboration practices.

Pergunta 86

  1. Implement a top-down directive to enforce strict training and work instruction procedures without involving the operators in the decision-making process.
  2. Work closely with the operators to develop comprehensive training programs and standardized work instructions that meet their needs and are based on their experience and insights.
  3. Replace operators who struggle with following standardized work instructions and provide training to new employees who are more likely to adhere to the established procedures.
  4. Hold training sessions for operators on the principles of Six Sigma and the importance of following standardized work instructions, without involving them in the development process.
  5. Recommend outsourcing the manufacturing process to a third-party company with a strong quality assurance track record to address the product quality issues.

Resposta correta 2. Work closely with the operators to develop comprehensive training programs and standardized work instructions that meet their needs and are based on their experience and insights.

Pergunta 87

  1. Implement a top-down directive to enforce standardized customer support procedures without seeking input or collaboration from the support team.
  2. Facilitate regular meetings and collaboration between the customer support team and the product development team to establish clear communication channels, share feedback, and jointly develop effective procedures for handling complaints.
  3. Replace team members in both the support and development teams who are resistant to collaboration and communication, and hire individuals who are more cooperative.
  4. Hold mandatory training sessions for the customer support team on Six Sigma principles and the importance of standardized procedures in handling complaints.
  5. Recommend outsourcing the customer support function to a third-party company with a better track record in handling complaints to resolve the customer satisfaction issues.

Resposta correta 2. Facilitate regular meetings and collaboration between the customer support team and the product development team to establish clear communication channels, share feedback, and jointly develop effective procedures for handling complaints.

Pergunta 88

  1. Implement a top-down directive to enforce standardized claim processing procedures without involving employees in the decision-making process.
  2. Work closely with employees to develop comprehensive process documentation and standardized work instructions that meet their needs and are based on their experience and insights.
  3. Replace employees who struggle with following standardized work instructions and provide training to new employees who are more likely to adhere to established procedures.
  4. Hold training sessions for employees on the principles of Six Sigma and the importance of following standardized work instructions, without involving them in the development process.
  5. Recommend outsourcing the benefit claims processing to a third-party company with a strong track record in claims processing to address the backlog and error rate issues.

Resposta correta 2. Work closely with employees to develop comprehensive process documentation and standardized work instructions that meet their needs and are based on their experience and insights.

Pergunta 89

  1. Implement a top-down directive to enforce standardized preventive maintenance procedures without involving maintenance technicians in the development process.
  2. Collaborate with maintenance technicians to develop comprehensive preventive maintenance procedures and provide training that meets their needs and is based on their experience and insights.
  3. Replace maintenance technicians who struggle with following standardized procedures and hire individuals who are more likely to adhere to established preventive maintenance processes.
  4. Hold mandatory training sessions for maintenance technicians on Six Sigma principles and the importance of following standardized preventive maintenance procedures, without involving them in the development process.
  5. Recommend outsourcing equipment maintenance to a specialized company to address the reliability issues and reduce internal maintenance costs.

Resposta correta 2. Collaborate with maintenance technicians to develop comprehensive preventive maintenance procedures and provide training that meets their needs and is based on their experience and insights.

Pergunta 90

  1. Implement a top-down directive to enforce standardized enrollment procedures without involving enrollment staff in the development process.
  2. Work collaboratively with the enrollment staff to develop comprehensive enrollment procedures and provide training that meets their needs and is based on their experience and insights.
  3. Replace enrollment staff who struggle with following standardized procedures and hire individuals who are more likely to adhere to established enrollment processes.
  4. Hold mandatory training sessions for enrollment staff on Six Sigma principles and the importance of following standardized enrollment procedures, without involving them in the development process.
  5. Recommend outsourcing student support services to a specialized company to address student retention issues and reduce internal costs.

Resposta correta 2. Work collaboratively with the enrollment staff to develop comprehensive enrollment procedures and provide training that meets their needs and is based on their experience and insights.

Inscrever na certificação

Garantimos que a sua formação gratuita em linha o fará passar no exame de certificação Six Sigma!

  1. 01

    Inscreva-se online

    Escolha a sua certificação acreditada e conclua a inscrição.

  2. 02

    Receba o código de acesso

    O seu código pessoal de acesso ao exame é enviado imediatamente por e-mail.

  3. 03

    Prepare e faça o exame

    Estude com a sua formação gratuita e responda online a 50 perguntas de escolha múltipla.

  4. 04

    Obtenha uma certificação vitalícia

    Receba o seu certificado válido em todo o mundo e o distintivo digital verificável.

Exemplo de Certified Six Sigma Master Black Belt™ (CSSMBB™) Certification
Inscrever na certificação

A SUA FORMAÇÃO PREMIUM GRATUITA ONLINE

O seu Six Sigma Revealed, segunda edição, está pronto.

Criámos a sua formação com um consórcio de líderes empresariais e de equipas de renome, coaches Six Sigma, mentores, especialistas e autoridades de todos os principais setores. Todas as pessoas que visitam o International Six Sigma Institute™ podem aceder à formação. Encontre os materiais em O seu livro gratuito de Six Sigma e A sua formação premium gratuita em Six Sigma do menu principal.

Estes materiais são propriedade intelectual do International Six Sigma Institute™ e estão protegidos por direitos de autor. Partilhamo-los gratuitamente com todos porque transmitir os nossos conhecimentos ajuda os profissionais de Six Sigma e contribui para o desenvolvimento desta área.

O seu exame de certificação utiliza perguntas de escolha múltipla. Estude a sua formação em linha para adquirir os conhecimentos necessários para passar no exame e obter a sua certificação Six Sigma.

Garantimos que a sua formação premium gratuita em linha o fará passar no exame de certificação Six Sigma!

Centenas de milhares de profissionais tiveram sucesso com as nossas certificações em testes de software!

NOSSA COMUNIDADE DE PARCEIROS

Aprendizado que aproxima as pessoas.

Turma da parceira MicroTrain Technologies em Chicago
MicroTrain Technologies · Chicago, Estados Unidos

Parabéns ao nosso parceiro MicroTrain Technologies em Chicago, Estados Unidos, e aos seus alunos pela conclusão bem-sucedida dos programas de formação e certificação Certified Six Sigma Green Belt (CSSGB)!

Leia a história do parceiro ↗O nosso programa de parcerias corporativas