Six Sigma and DMAIC Methodology OverviewA six-step practical process beside the DMAIC cycle. RECOGNIZE leads into DEFINE; DEFINE leads outward to REALIZE. No lines map individual left-hand process steps to right-hand phases.PracticalProblemUnderstand the problem thatimpacts businessperformanceStatisticalProblemIdentify the problem withdata and factsStatisticalSolutionFind out a data-driven andreliable solutionPracticalSolutionProvide a solution toincrease profit, reducewasteControl PlanCreate a system to sustaina long-term solutionResultsMeasure and reap thebenefits of financialsuccessesRECOGNIZEREALIZEDEFINEMEASUREANALYZEIMPROVECONTROLVOICE OFCUSTOMER&VOICE OFPROCESS
Открыть схему в полном размере

General Six Sigma Questions

Вопрос 1 Как в этом примере называют ошибку, когда ее находит тестировщик, и как ее называют после подтверждения разработчиком?

  1. Дефект и баг
  2. Дефект и отказ
  3. Отказ и баг
  4. Отказ и дефект
  5. Проблема и баг

Правильный ответ 5. Проблема и баг

Вопрос 2 Расположите этапы формальной проверки по порядку. (a) Планирование, (b) исправление, (c) встреча по итогам проверки, (d) контроль выполнения, (e) стартовая встреча, (f) индивидуальная подготовка.

  1. Identify Vital Project X’s and statistically validate them
  2. Communicate & sign off to close Project
  3. Generate Potential Solutions & Assess Failure Mode
  4. all of the above
  5. none of the above

Правильный ответ 1. Identify Vital Project X’s and statistically validate them

Вопрос 3 Что оценивает нефункциональное тестирование?

  1. Производительность
  2. Удобство использования
  3. Какие функции следует исключить
  4. Все перечисленное
  5. Варианты 1 и 2

Правильный ответ 4. Все перечисленное

Вопрос 4 В какой части плана тестирования указано, когда следует закончить тестирование?

  1. Стратегия тестирования
  2. Тестовая среда
  3. Критерии завершения тестирования
  4. Цель тестирования
  5. Все перечисленное

Правильный ответ 2. Тестовая среда

Вопрос 5 Зачем нужны интеграционные тесты?

  1. Чтобы проверить качество модульного тестирования
  2. Чтобы проверить, может ли система подключаться к другим системам в сети
  3. Чтобы проверить, насколько хорошо модули сочетаются и работают вместе
  4. Чтобы проверить, удачно ли проект разбит на модули
  5. Чтобы выявить ошибки проектирования

Правильный ответ 1. Чтобы проверить качество модульного тестирования

Вопрос 6 Какая задача обычно не входит в обязанности тестировщика?

  1. Проконсультироваться с поставщиком, чтобы выбрать лучший инструмент для тестирования
  2. Подготовить тестовые данные
  3. Составить тестовые сценарии
  4. Сообщить о дефектах
  5. Реализовать тесты на всех уровнях

Правильный ответ 4. Сообщить о дефектах

Вопрос 7 Какой вид тестирования клиенты проводят на своей площадке?

  1. Бета-тестирование
  2. Альфа-тестирование
  3. Тестирование методом черного ящика
  4. Тестирование методом белого ящика
  5. Все перечисленное

Правильный ответ 2. Альфа-тестирование

Вопрос 8 Какая деятельность позволяет управлять изменениями в разных версиях ПО?

  1. Управление изменениями
  2. Управление продуктом
  3. Управление бизнесом
  4. Управление тестированием
  5. Управление конфигурацией

Правильный ответ 3. Управление бизнесом

Вопрос 9 Что помогает разработчику решить, какой баг исправить первым?

  1. Серьезность
  2. Приоритет
  3. Матрица трассируемости
  4. Метрики тестирования
  5. Метрики процессов

Правильный ответ 4. Метрики тестирования

Вопрос 10 Какие сведения лишние в отчете об инциденте при тестировании?

  1. Как воспроизвести дефект
  2. Детали тестовой среды
  3. Приоритет дефекта
  4. Как следует исправить дефект
  5. Серьезность дефекта

Правильный ответ 1. Как воспроизвести дефект

Certified Six Sigma Yellow Belt Test Questions

Вопрос 11

  1. Conduct a Fishbone (Ishikawa) diagram analysis to identify potential root causes of defects.
  2. Initiate a Green Belt project to address the defect issue, as Yellow Belts typically don't lead projects.
  3. Define the problem more clearly by collecting additional data on when and where defects occur.
  4. Immediately implement process changes based on the existing data to reduce defects.
  5. Consult with top management to seek their input on the next steps to take in the project.

Правильный ответ 3. Define the problem more clearly by collecting additional data on when and where defects occur.

Вопрос 12

  1. Ignore the resistance and proceed with the implementation as planned, as it's the best solution for the hospital.
  2. Hold training sessions for the employees to help them become proficient with the new system and address their concerns.
  3. Terminate the employees who resist the implementation to send a strong message to the rest of the team.
  4. Seek approval from the hospital's board of directors before proceeding with any changes to the registration process.
  5. Revert to the old paper-based system to avoid conflicts and maintain employee satisfaction.

Правильный ответ 2. Hold training sessions for the employees to help them become proficient with the new system and address their concerns.

Вопрос 13

  1. Implement process changes immediately without further analysis to address the identified issues.
  2. Hold a brainstorming session with the project team to generate ideas for process improvements based on the identified themes.
  3. Ignore the data and continue with the current customer service processes, as they have been in place for years.
  4. Perform a root cause analysis to understand the underlying factors contributing to the identified issues and prioritize improvements accordingly.
  5. Hire a customer service consultant to make recommendations based on the data findings.

Правильный ответ 4. Perform a root cause analysis to understand the underlying factors contributing to the identified issues and prioritize improvements accordingly.

Вопрос 14

  1. Randomly select one factor to focus on and start the improvement process with it.
  2. Use a cause-and-effect diagram (Ishikawa or Fishbone diagram) to visualize the potential causes and their relationships.
  3. Focus solely on operator training, as it's the most common cause of defects in manufacturing processes.
  4. Conduct a survey of all employees to gather their opinions on which factor to address first.
  5. Prioritize based on the cost of implementing improvements for each factor, starting with the most cost-effective one.

Правильный ответ 2. Use a cause-and-effect diagram (Ishikawa or Fishbone diagram) to visualize the potential causes and their relationships.

Вопрос 15

  1. Run a regression analysis on the collected data to identify the most significant factors affecting customer satisfaction.
  2. Use a control chart to monitor and control the order fulfillment process and reduce defects in real-time.
  3. Implement a Voice of the Customer (VOC) survey to collect customer feedback on their preferences and satisfaction with the order fulfillment process.
  4. Engage with the company's employees to gather their insights on customer preferences and expectations.
  5. Increase the number of quality checks in the order fulfillment process to ensure that orders meet customer expectations.

Правильный ответ 3. Implement a Voice of the Customer (VOC) survey to collect customer feedback on their preferences and satisfaction with the order fulfillment process.

Вопрос 16

  1. Implement a Total Quality Management (TQM) system to address various aspects of the organization's quality issues.
  2. Conduct a series of brainstorming sessions with the pharmacy team to generate ideas for improvement.
  3. Use a Failure Mode and Effects Analysis (FMEA) to prioritize potential failure modes and their impacts on the medication process.
  4. Implement a visual management system in the pharmacy to increase transparency and reduce errors.
  5. Develop a detailed project plan using the DMAIC (Define, Measure, Analyze, Improve, Control) methodology to address the identified issues systematically.

Правильный ответ 5. Develop a detailed project plan using the DMAIC (Define, Measure, Analyze, Improve, Control) methodology to address the identified issues systematically.

Вопрос 17

  1. Implement an automated data entry system to eliminate errors and streamline the order processing process.
  2. Request faster response times from suppliers without making any changes to the internal processes.
  3. Hold a team meeting to discuss the identified issues and brainstorm solutions to address the bottlenecks.
  4. Implement a Just-In-Time (JIT) inventory system to reduce the reliance on suppliers for order processing.
  5. Conduct a Value Stream Mapping (VSM) analysis to identify waste and inefficiencies in the order processing process and create a plan for improvement.

Правильный ответ 5. Conduct a Value Stream Mapping (VSM) analysis to identify waste and inefficiencies in the order processing process and create a plan for improvement.

Вопрос 18

  1. Hire additional staff to expedite the credit check process and reduce delays.
  2. Introduce a new software tool for the credit check process without analyzing its impact on existing operations.
  3. Streamline the credit check process by identifying and eliminating non-value-added steps and inefficiencies.
  4. Outsource the credit check process to a third-party company to reduce the workload on the internal team.
  5. Implement a new policy that prioritizes certain loan applications and fast-tracks them through the credit check stage.

Правильный ответ 3. Streamline the credit check process by identifying and eliminating non-value-added steps and inefficiencies.

Вопрос 19

  1. Use a control chart to monitor defects and react to any variations during production.
  2. Implement a Just-In-Time (JIT) production system to minimize the impact of variations in raw materials.
  3. Conduct a Failure Mode and Effects Analysis (FMEA) to prioritize and address the factors contributing to defects systematically.
  4. Hire a consultant to assess and recommend improvements in machine calibration and operator training.
  5. Implement a Total Quality Management (TQM) system to address various aspects of the manufacturing process simultaneously.

Правильный ответ 3. Conduct a Failure Mode and Effects Analysis (FMEA) to prioritize and address the factors contributing to defects systematically.

Вопрос 20

  1. Install more self-check-in kiosks to reduce wait times and automate the process.
  2. Require all employees to complete a customer service training program to enhance their interactions with guests during check-in.
  3. Introduce a loyalty program that provides personalized perks to repeat guests, addressing the lack of personalization.
  4. Streamline the check-in process by identifying and eliminating non-value-added steps and paperwork errors.
  5. Outsource the entire guest check-in process to a third-party company to reduce in-house workload.

Правильный ответ 4. Streamline the check-in process by identifying and eliminating non-value-added steps and paperwork errors.

Certified Six Sigma Green Belt Test Questions

Вопрос 21

  1. Define
  2. Measure
  3. Analyze
  4. Improve
  5. Control

Правильный ответ 4. Improve

Вопрос 22

  1. Define
  2. Measure
  3. Analyze
  4. Improve
  5. Control

Правильный ответ 3. Analyze

Вопрос 23

  1. Pareto Chart
  2. Fishbone Diagram (Ishikawa)
  3. Regression Analysis
  4. 5 Whys Analysis
  5. Process Mapping

Правильный ответ 3. Regression Analysis

Вопрос 24

  1. Identify potential root causes of the problem.
  2. Implement and sustain the improvements made during the project.
  3. Analyze data to uncover patterns and trends.
  4. Set project goals and objectives.
  5. Collect baseline data to measure process performance.

Правильный ответ 2. Implement and sustain the improvements made during the project.

Вопрос 25

  1. Continue collecting data but do not take any further action.
  2. Implement additional changes to see if further improvements can be made.
  3. Monitor the process to ensure the improvements are sustained and address any deviations from the new standard (standard deviation).
  4. Conduct a new root cause analysis to identify other potential improvements.
  5. Discontinue the project as the improvements have been made.

Правильный ответ 3. Monitor the process to ensure the improvements are sustained and address any deviations from the new standard (standard deviation).

Вопрос 26

  1. Collect additional data to analyze the waiting times further.
  2. Train the emergency department staff on the new process changes.
  3. Monitor and sustain the improvements in patient waiting times over time.
  4. Conduct a new root cause analysis to identify additional issues.
  5. Discontinue the project as the waiting times have improved.

Правильный ответ 3. Monitor and sustain the improvements in patient waiting times over time.

Вопрос 27

  1. Document the process changes but do not implement any control measures.
  2. Set new project goals to aim for further improvements.
  3. Implement control measures to monitor the process and sustain the measurement improvements.
  4. Move on to another project to maximize the benefits of Six Sigma.
  5. Conduct a final analysis and report the project's success.

Правильный ответ 3. Implement control measures to monitor the process and sustain the measurement improvements.

Вопрос 28

  1. Discontinue the project as the improvements have been made.
  2. Train the customer support team in new procedures to handle returns.
  3. Monitor key performance indicators related to the return process to ensure ongoing improvement.
  4. Initiate a new project to address a different aspect of customer satisfaction.
  5. Document the improvements made in a final report for management.

Правильный ответ 3. Monitor key performance indicators related to the return process to ensure ongoing improvement.

Вопрос 29

  1. Conduct a new root cause analysis to explore additional issues affecting product quality.
  2. Train the production team on the newly implemented quality control measures.
  3. Monitor and measure key quality indicators to ensure that the improvements are maintained.
  4. Discontinue the project as the initial improvements have been made.
  5. Implement additional changes to further optimize product quality.

Правильный ответ 3. Monitor and measure key quality indicators to ensure that the improvements are maintained.

Вопрос 30

  1. Conduct a new root cause analysis to explore other factors contributing to billing errors.
  2. Train the billing team on the new procedures and quality control measures.
  3. Monitor key performance indicators related to billing errors to ensure sustained improvements.
  4. Discontinue the project as initial improvements have been made.
  5. Implement additional changes to further optimize the billing process.

Правильный ответ 3. Monitor key performance indicators related to billing errors to ensure sustained improvements.

Certified Six Sigma Black Belt Test Questions

Вопрос 31

  1. Control Chart
  2. Fishbone Diagram
  3. Value Stream Mapping
  4. Brainstorming
  5. 5 Whys Analysis

Правильный ответ 1. Control Chart

Вопрос 32

  1. SIPOC Diagram
  2. Scatter Plot
  3. Control Chart
  4. Pareto Chart
  5. Regression Analysis

Правильный ответ 4. Pareto Chart

Вопрос 33

  1. Chi-Square Test
  2. One-Way ANOVA
  3. T-Test
  4. Regression Analysis
  5. Fishbone Diagram

Правильный ответ 3. T-Test

Вопрос 34

  1. Identify the causes of defects in the software development process.
  2. Rank potential failure modes based on their impact and likelihood.
  3. Create a detailed process map of the software development process.
  4. Collect data on the defect rate in the software development process.
  5. Define the critical-to-quality characteristics of the software.

Правильный ответ 2. Rank potential failure modes based on their impact and likelihood.

Вопрос 35

  1. Process Map
  2. Brainstorming
  3. Quality Function Deployment (QFD)
  4. Check Sheet
  5. Scatter Plot

Правильный ответ 3. Quality Function Deployment (QFD)

Вопрос 36

  1. Define
  2. Measure
  3. Analyze
  4. Improve
  5. Control

Правильный ответ 4. Improve

Вопрос 37

  1. Pareto Chart
  2. Value Stream Mapping
  3. Scatter Plot
  4. Failure Mode and Effects Analysis (FMEA)
  5. Control Chart

Правильный ответ 1. Pareto Chart

Вопрос 38

  1. Regression Analysis
  2. Chi-Square Test
  3. Analysis of Variance (ANOVA)
  4. Control Chart
  5. Histogram

Правильный ответ 3. Analysis of Variance (ANOVA)

Вопрос 39

  1. SIPOC Diagram
  2. Control Chart
  3. Scatter Plot
  4. Value Stream Mapping
  5. Pareto Chart

Правильный ответ 3. Scatter Plot

Вопрос 40

  1. Hold regular project review meetings to monitor progress.
  2. Update the project charter with new goals and objectives.
  3. Implement a control plan and continue to collect and analyze data.
  4. Conduct additional training for team members on the improved process.
  5. Archive all project documents for historical reference.

Правильный ответ 3. Implement a control plan and continue to collect and analyze data.

Certified Six Sigma Master Black Belt Test Questions

Вопрос 41

  1. John can conclude that the process is not capable, and he should focus on reducing variability within the process to meet customer requirements.
  2. John can conclude that the process is highly capable, and there is no need for process improvement efforts.
  3. John should focus on increasing the process capability index (Cp) to at least 2.0, which is considered the industry standard for capability.
  4. John should consult with the customers to see if their requirements can be relaxed, given the current process capability indices.
  5. John should ignore the process capability indices and proceed to the Analyze phase of the project.

Правильный ответ 1. John can conclude that the process is not capable, and he should focus on reducing variability within the process to meet customer requirements.

Вопрос 42

  1. Process Capability Analysis and FMEA (Failure Mode and Effects Analysis).
  2. Fishbone Diagram (Ishikawa) and 5 Whys Analysis.
  3. Control Charts and ANOVA (Analysis of Variance).
  4. Pareto Chart and Hypothesis Testing (e.g., t-test).
  5. Value Stream Mapping and Kaizen events.

Правильный ответ 5. Value Stream Mapping and Kaizen events.

Вопрос 43

  1. Daniel should focus on operator training as the primary root cause and initiate training programs to reduce defects.
  2. Daniel should address all three root causes simultaneously to ensure a comprehensive improvement of the process.
  3. Daniel should prioritize the root causes based on their potential impact and ease of implementation, and address them one by one.
  4. Daniel should disregard the root causes and look for quick fixes to reduce defects in the short term.
  5. Daniel should consult with an external expert to make the final decision on which root cause to address first.

Правильный ответ 3. Daniel should prioritize the root causes based on their potential impact and ease of implementation, and address them one by one.

Вопрос 44

  1. Customer Service Representative, IT Specialist, and Data Analyst.
  2. Project Sponsor, Green Belt, and Customer Liaison.
  3. Project Champion, Process Owner, and Project Manager.
  4. Yellow Belt, Black Belt, and Master Black Belt.
  5. Team Lead, Subject Matter Expert, and Statistician.

Правильный ответ 3. Project Champion, Process Owner, and Project Manager.

Вопрос 45

  1. Ignore the VOC data and focus solely on reducing cycle time to meet internal goals.
  2. Conduct a detailed analysis to identify areas where cycle time can be reduced without compromising the quality of credit checks.
  3. Increase the number of credit checks to ensure thoroughness, even if it results in longer cycle times.
  4. Meet with customers to explain the challenges in balancing speed and thorough credit checks and ask for their input on potential trade-offs.
  5. Delegate the responsibility for making this decision to the project team without further involvement from customers.

Правильный ответ 4. Meet with customers to explain the challenges in balancing speed and thorough credit checks and ask for their input on potential trade-offs.

Вопрос 46

  1. Cost of implementing the improvements, impact on cycle time, and potential increase in product quality.
  2. Employee satisfaction, market trends, and supplier performance.
  3. Current market share, customer loyalty, and historical sales data.
  4. Weather conditions, global economic factors, and employee turnover rate.
  5. Projected revenue, project team's morale, and the availability of new technology.

Правильный ответ 1. Cost of implementing the improvements, impact on cycle time, and potential increase in product quality.

Вопрос 47

  1. Pareto Chart.
  2. Control Chart (e.g., X-bar and R chart).
  3. Scatter Plot.
  4. Failure Mode and Effects Analysis (FMEA).
  5. Box and Whisker Plot.

Правильный ответ 2. Control Chart (e.g., X-bar and R chart).

Вопрос 48

  1. Ignore the resistance and proceed with the changes as planned, assuming team members will adapt over time.
  2. Communicate the benefits of the changes and involve the resistant team members in the decision-making process to address their concerns.
  3. Replace the resistant team members with more cooperative individuals to avoid delays in implementation.
  4. Abandon the changes and revert to the previous process to maintain team harmony and avoid conflicts.
  5. Hold a team meeting and ask for volunteers to take on the responsibility of implementing the changes despite resistance.

Правильный ответ 2. Communicate the benefits of the changes and involve the resistant team members in the decision-making process to address their concerns.

Вопрос 49

  1. Address all factors simultaneously to ensure a comprehensive approach to reducing defects.
  2. Conduct a survey of the team members to gather their opinions on the most critical factors and prioritize accordingly.
  3. Use a Fishbone Diagram to visually represent the factors and their potential impact, then prioritize based on the Pareto principle.
  4. Randomly select one factor for improvement to maintain the project's agility and flexibility in addressing defects.
  5. Prioritize the factors based on statistical analysis and data-driven methods, such as Design of Experiments (DOE).

Правильный ответ 5. Prioritize the factors based on statistical analysis and data-driven methods, such as Design of Experiments (DOE).

Вопрос 50

  1. Implement regular training sessions for call center agents to address any performance decline.
  2. Establish Key Performance Indicators (KPIs) to monitor call center efficiency and conduct monthly reviews to identify any deviations.
  3. Introduce performance-based incentives for call center agents to maintain their motivation and productivity.
  4. Create a suggestion system to encourage call center agents to provide continuous improvement ideas and incentives for the best suggestions.
  5. Conduct quarterly audits of the call center processes and make necessary adjustments based on audit findings.

Правильный ответ 2. Establish Key Performance Indicators (KPIs) to monitor call center efficiency and conduct monthly reviews to identify any deviations.

Certified Six Sigma Champion Test Questions

Вопрос 51

  1. You should immediately approve the purchase of new machines as a solution to the problem.
  2. You should request a cost-benefit analysis to ensure that investing in new machines is justified.
  3. You should instruct the team to start machine calibration more frequently to reduce defects.
  4. You should ask the team to explore alternative solutions, such as improving the existing calibration process.
  5. You should consult with the production team and make a decision based on their preferences.

Правильный ответ 2. You should request a cost-benefit analysis to ensure that investing in new machines is justified.

Вопрос 52

  1. Direct the team to continue addressing process-related issues, as employee morale and training are not within the scope of this project.
  2. Expand the project scope to include employee morale and training as critical factors in defect reduction.
  3. Bring in a separate team to focus on employee morale and training issues while the current team continues to work on process improvements.
  4. Conduct a comprehensive analysis to determine the extent to which employee morale and training impact the defect rate and then decide on the appropriate course of action.
  5. Ignore the employee morale and training issues, as they are not relevant to Six Sigma projects.

Правильный ответ 4. Conduct a comprehensive analysis to determine the extent to which employee morale and training impact the defect rate and then decide on the appropriate course of action.

Вопрос 53

  1. Ignore the resistance and focus on achieving project goals, as employee concerns are a secondary consideration.
  2. Engage in one-on-one discussions with the resistant employees to address their concerns and seek their input on process improvements.
  3. Implement the changes without informing the employees to avoid unnecessary resistance.
  4. Terminate the resistant employees and hire new ones who are more open to process improvements.
  5. Hold a town hall meeting to communicate the project's goals, benefits, and the company's commitment to employee welfare.

Правильный ответ 5. Hold a town hall meeting to communicate the project's goals, benefits, and the company's commitment to employee welfare.

Вопрос 54

  1. Disregard the concerns of healthcare professionals and proceed with the project to meet the established timelines.
  2. Engage in individual conversations with resistant healthcare professionals to better understand their concerns and involve them in the improvement process.
  3. Implement the changes without informing healthcare professionals, as the project's goals are more important than individual concerns.
  4. Replace the resistant healthcare professionals with those who are more open to process improvements.
  5. Hold a series of team meetings to discuss the project's goals, share data on the impact of waiting times, and collaborate on solutions that address both patient care quality and reduced waiting times.

Правильный ответ 5. Hold a series of team meetings to discuss the project's goals, share data on the impact of waiting times, and collaborate on solutions that address both patient care quality and reduced waiting times.

Вопрос 55

  1. Ignore the potential job losses and proceed with the supplier change to achieve cost savings.
  2. Conduct a cost-benefit analysis that includes the impact on both companies and explores alternatives to minimize job losses.
  3. Immediately terminate the contract with the current supplier and switch to the new one to save costs.
  4. Avoid discussing the potential job losses and focus on the financial benefits for your company.
  5. Hold a meeting with representatives from both companies to discuss the situation openly and explore ways to minimize the impact on jobs.

Правильный ответ 2. Conduct a cost-benefit analysis that includes the impact on both companies and explores alternatives to minimize job losses.

Вопрос 56

  1. Disregard the concerns and assume that the process changes will continue to be effective.
  2. Hold a meeting with the team to review the data and celebrate the initial success of the project.
  3. Ask the team to document the process changes and create a plan for ongoing monitoring and control.
  4. Terminate the project, as the initial defect reduction demonstrates its success.
  5. Encourage the team to be vigilant and continue monitoring the process to prevent regressions and further improvements.

Правильный ответ 3. Ask the team to document the process changes and create a plan for ongoing monitoring and control.

Вопрос 57

  1. Allocate the entire budget and resources to the implementation of the new software, as it is the most critical improvement area.
  2. Implement all identified improvements simultaneously to expedite the project's completion.
  3. Conduct a cost-benefit analysis to determine the potential impact and return on investment for each improvement area and prioritize accordingly.
  4. Delay the project until additional budget and resources become available to address all identified improvement areas.
  5. Assign the highest-priority improvement area based on the project team's recommendations.

Правильный ответ 3. Conduct a cost-benefit analysis to determine the potential impact and return on investment for each improvement area and prioritize accordingly.

Вопрос 58

  1. Ignore the resistance and focus on implementing the new process, as it is more efficient.
  2. Terminate the employment of the resistant employees to remove obstacles to change.
  3. Engage in one-on-one discussions with the resistant employees to understand their concerns and provide training on the new process.
  4. Conduct a thorough change management plan that involves communication, training, and involvement of employees in the process redesign.
  5. Ignore the resistance and proceed with the project, expecting that employees will adapt over time.

Правильный ответ 4. Conduct a thorough change management plan that involves communication, training, and involvement of employees in the process redesign.

Вопрос 59

  1. Ignore the staff shortage issue and focus on other root causes to avoid additional complexities.
  2. Engage in one-on-one discussions with the management to request additional staff during peak hours.
  3. Terminate the project, as addressing the staff shortage is beyond the scope of the project.
  4. Work with the project team to analyze the impact of staff shortage on waiting times and determine the feasibility of adding temporary staff during peak hours.
  5. Continue the project and hope that process improvements alone will resolve the waiting time issue.

Правильный ответ 4. Work with the project team to analyze the impact of staff shortage on waiting times and determine the feasibility of adding temporary staff during peak hours.

Вопрос 60

  1. Implement a standardized development process without consulting the project team, as it will save time and resources.
  2. Terminate the project, as standardizing the development process is beyond the project's scope.
  3. Conduct a meeting with the project team to collaboratively develop and implement a standardized development process.
  4. Ignore the issue and focus on identifying and fixing defects in the software products as they arise.
  5. Assign the task of standardizing the development process to a separate team, independent of the project team, to ensure objectivity.

Правильный ответ 3. Conduct a meeting with the project team to collaboratively develop and implement a standardized development process.

Certified Six Sigma Deployment Leader Test Questions

Вопрос 61

  1. John should immediately approve the budget for the new equipment to address the bottleneck.
  2. John should consult with the company's financial team to assess the ROI of investing in the new equipment and present a data-driven proposal to the management.
  3. John should wait for senior management to initiate such investments without his involvement.
  4. John should request an extension of the project timeline until the budget for the new equipment is approved.
  5. John should inform the team to continue data collection without addressing the bottleneck until a future phase of the project.

Правильный ответ 2. John should consult with the company's financial team to assess the ROI of investing in the new equipment and present a data-driven proposal to the management.

Вопрос 62

  1. A list of all the project team members' academic qualifications and certifications.
  2. A high-level project timeline with milestones and deadlines for each phase of DMAIC.
  3. Details about the company's annual budget and revenue projections for the year.
  4. A brief description of the team's preferred communication tools and methods.
  5. A clear problem statement, project scope, objectives, and expected outcomes of the Six Sigma project.

Правильный ответ 5. A clear problem statement, project scope, objectives, and expected outcomes of the Six Sigma project.

Вопрос 63

  1. Immediately implementing all identified process improvements without testing or validation.
  2. Conducting a pilot test of the proposed process improvements with a small, representative group of team members.
  3. Continuing data collection and analysis to identify additional root causes and potential improvements.
  4. Documenting the current process extensively, regardless of whether it aligns with the proposed improvements.
  5. Seeking approval from senior management for a significant increase in the project budget to fund all proposed improvements.

Правильный ответ 2. Conducting a pilot test of the proposed process improvements with a small, representative group of team members.

Вопрос 64

  1. Brainstorming sessions with the project team to gather their opinions on which improvements are most important.
  2. Implement all identified improvements simultaneously to address every issue at once.
  3. Use a Failure Modes and Effects Analysis (FMEA) to assess the impact and probability of success for each improvement.
  4. Consult with the hospital's board of directors to get their input on which improvements to prioritize.
  5. Assign priorities based on the cost of implementing each improvement, starting with the least expensive ones first.

Правильный ответ 3. Use a Failure Modes and Effects Analysis (FMEA) to assess the impact and probability of success for each improvement.

Вопрос 65

  1. Select the solution that requires the least financial investment, even if it has a lower probability of success.
  2. Choose the solution that team members prefer the most, as it will boost morale and motivation.
  3. Base the decision on data and statistical analysis, selecting the solution with the highest likelihood of reducing defects effectively.
  4. Opt for the solution that aligns with the company's latest strategic initiatives, regardless of its impact on defect reduction.
  5. Consult with external industry experts to get their opinion on which solution to choose.

Правильный ответ 3. Base the decision on data and statistical analysis, selecting the solution with the highest likelihood of reducing defects effectively.

Вопрос 66

  1. Immediately implement process changes based on the data collected without consulting employees.
  2. Hold a series of training sessions for employees to ensure they follow a standardized onboarding process.
  3. Conduct a Root Cause Analysis (RCA) to identify the underlying causes of variations in employee performance.
  4. Recommend replacing the entire onboarding team with new employees who can follow a standardized process more effectively.
  5. Consult with senior management to get their opinion on which step to take next.

Правильный ответ 3. Conduct a Root Cause Analysis (RCA) to identify the underlying causes of variations in employee performance.

Вопрос 67

  1. Assign each team member to investigate one potential cause separately and report back in the next team meeting.
  2. Immediately implement changes to address all potential causes to see which one works best in practice.
  3. Conduct further data analysis and statistical tests to determine which potential cause has the most significant impact on inventory issues.
  4. Consult with external industry experts to get their opinion on which potential cause to address first.
  5. Request additional budget from senior management to address all potential causes simultaneously to avoid any delays in the project.

Правильный ответ 3. Conduct further data analysis and statistical tests to determine which potential cause has the most significant impact on inventory issues.

Вопрос 68

  1. To provide data for performance evaluations of the production line workers.
  2. To justify the need for replacing the current workforce with more skilled employees.
  3. To facilitate regular audits by external quality assurance agencies.
  4. To ensure that the improved production process maintains a stable and predictable level of quality and performance.
  5. To gather data for marketing purposes to show customers that the product line is improving.

Правильный ответ 4. To ensure that the improved production process maintains a stable and predictable level of quality and performance.

Вопрос 69

  1. To assign blame to individual team members responsible for defects in software releases.
  2. To increase the workload on software developers to ensure they are more cautious in their work.
  3. To reduce the need for software testing and quality assurance activities, saving time and resources.
  4. To identify and prevent defects in software releases, improving the overall quality and reliability of the software.
  5. To justify the need for outsourcing software development to third-party vendors with a better track record.

Правильный ответ 4. To identify and prevent defects in software releases, improving the overall quality and reliability of the software.

Вопрос 70

  1. To identify employees who are not following the new routing and scheduling processes and reprimand them for non-compliance.
  2. To collect data for marketing purposes to demonstrate to customers that the company's delivery services have improved.
  3. To justify further cost-cutting measures, such as reducing the number of delivery trucks and drivers, to save additional money.
  4. To ensure that the new routing and scheduling processes are consistently followed and that any deviations can be quickly addressed to maintain efficiency and cost savings.
  5. To measure the performance of the newly implemented processes once and report the results to senior management for evaluation.

Правильный ответ 4. To ensure that the new routing and scheduling processes are consistently followed and that any deviations can be quickly addressed to maintain efficiency and cost savings.

Certified Six Sigma Trainer Test Questions

Вопрос 71

  1. Alex should spend extra time explaining Control Charts to Sarah, using real-life examples from her role.
  2. Alex should tell Sarah to research Control Charts on her own time if she wants to understand their relevance.
  3. Alex should skip the topic of Control Charts to keep the training on schedule.
  4. Alex should ask another team member to explain Control Charts to Sarah since they might understand better.
  5. Alex should ignore Sarah's concerns and continue with the training as planned.

Правильный ответ 1. Alex should spend extra time explaining Control Charts to Sarah, using real-life examples from her role.

Вопрос 72

  1. Emily should agree with Tom and emphasize that Six Sigma is overly reliant on statistics.
  2. Emily should suggest that Tom considers other quality improvement methodologies that are less data-driven.
  3. Emily should offer to provide additional resources and support to help Tom improve his statistical analysis skills.
  4. Emily should encourage the rest of the group to share their perspectives on the importance of data analysis in Six Sigma projects.
  5. Emily should ignore Tom's concerns and continue with the planned training agenda without addressing the issue.

Правильный ответ 3. Emily should offer to provide additional resources and support to help Tom improve his statistical analysis skills.

Вопрос 73

  1. Jessica should encourage Mark to stick with the DMAIC approach, as it's a standard in Six Sigma, and other approaches may not be as effective.
  2. Jessica should insist that Mark follows the DMAIC approach but also encourages participants to explore other approaches in their free time.
  3. Jessica should allow teams to choose the approach they believe is most suitable for their specific projects and provide guidance and resources for various methodologies.
  4. Jessica should assign Mark to a project that explicitly requires the DMAIC approach to resolve the issue.
  5. Jessica should ignore Mark's insistence and let the teams decide on their project approaches independently.

Правильный ответ 3. Jessica should allow teams to choose the approach they believe is most suitable for their specific projects and provide guidance and resources for various methodologies.

Вопрос 74

  1. Lisa should agree with Peter and suggest that Control Plans are often unnecessary and can be skipped in some cases.
  2. Lisa should recommend that Peter's organization should only implement Control Plans for high-impact projects to save time and resources.
  3. Lisa should explain the importance of Control Plans in sustaining improvements and preventing the regression of the process, highlighting their value in the long term.
  4. Lisa should suggest that Peter discusses his concerns with his organization's leadership and follows their guidance on whether to use Control Plans or not.
  5. Lisa should ignore Peter's concerns and continue with the training as planned, focusing on the standard Six Sigma process steps.

Правильный ответ 3. Lisa should explain the importance of Control Plans in sustaining improvements and preventing the regression of the process, highlighting their value in the long term.

Вопрос 75

  1. Advise the team to follow Sarah's suggestion and create a Fishbone Diagram to identify potential causes of defects.
  2. Recommend that the team uses both tools, starting with a Fishbone Diagram to identify potential causes and then using FMEA to assess the criticality of each cause.
  3. Suggest that the team discusses the advantages and disadvantages of both tools and makes a collaborative decision on which one to use based on the specific context of the project.
  4. Support Tom's preference for FMEA and guide the team to use this method exclusively, as it's more comprehensive than the Fishbone Diagram.
  5. Ignore the team's debate and make the decision yourself, opting for one of the methods based on your personal preference as the Trainer.

Правильный ответ 3. Suggest that the team discusses the advantages and disadvantages of both tools and makes a collaborative decision on which one to use based on the specific context of the project.

Вопрос 76

  1. Ignore the disengaged participants and focus on those who are actively participating to keep the training on schedule.
  2. Publicly call out the disengaged participants to encourage their participation and make them feel accountable for their involvement.
  3. Have a one-on-one conversation with each disengaged participant to understand their concerns and tailor the training to their needs.
  4. Implement interactive activities and exercises that require active participation, encouraging all participants to get involved in the discussions.
  5. Conclude the training session early since the disengaged participants may not be receptive to the material, and it's best not to waste time on them.

Правильный ответ 4. Implement interactive activities and exercises that require active participation, encouraging all participants to get involved in the discussions.

Вопрос 77

  1. Agree with Mary and suggest that Lean principles may not be applicable in all situations, making them optional for process improvement.
  2. Ask Mary to provide specific examples from her organization's processes to demonstrate why she believes Lean principles are irrelevant, and then discuss each example individually.
  3. Explain the fundamental Lean principles and their benefits, using real-life case studies and examples to illustrate their applicability in various industries and situations.
  4. Suggest that Mary conducts additional research on Lean principles on her own time to gain a better understanding of their potential benefits.
  5. Ignore Mary's objections and continue with the training, focusing on the standard curriculum without addressing her concerns.

Правильный ответ 3. Explain the fundamental Lean principles and their benefits, using real-life case studies and examples to illustrate their applicability in various industries and situations.

Вопрос 78

  1. Agree with John and suggest that SPC is outdated, making it optional for modern manufacturing processes.
  2. Invite John to share his thoughts on how modern manufacturing processes have evolved and discuss whether SPC can be adapted to address the changing needs of the industry.
  3. Explain the foundational principles of SPC and how it can be adapted to modern manufacturing, providing examples of successful implementations in automated and digitized environments.
  4. Suggest that John research alternative methodologies to SPC that may be more suitable for modern manufacturing and share his findings with the group.
  5. Ignore John's objections and continue with the training, following the standard curriculum without addressing his concerns.

Правильный ответ 3. Explain the foundational principles of SPC and how it can be adapted to modern manufacturing, providing examples of successful implementations in automated and digitized environments.

Вопрос 79

  1. Politely request that Sarah save her questions and comments for designated Q&A sessions to ensure the training stays on track.
  2. Allow Sarah to continue with her questions and comments, as it's important to address participants' queries promptly to keep them engaged.
  3. Ask the rest of the group how they feel about Sarah's interruptions and follow their consensus on whether to address her behavior or not.
  4. Reprimand Sarah publicly to deter her from further interruptions and maintain the training's structure and focus.
  5. Ignore Sarah's interruptions and continue with the training, allowing her to interject as she sees fit without addressing the issue.

Правильный ответ 1. Politely request that Sarah save her questions and comments for designated Q&A sessions to ensure the training stays on track.

Вопрос 80

  1. Agree with the participants and suggest that Green Belt projects are resource-intensive and may not be worth the investment for every organization.
  2. Advocate for the importance of Green Belt projects and recommend that organizations prioritize allocating resources to them for long-term process improvement benefits.
  3. Encourage the participants to discuss their concerns with their organization's leadership and seek their guidance on the allocation of resources for Green Belt projects.
  4. Provide examples of organizations that have successfully implemented Green Belt projects and demonstrate the return on investment and process improvements achieved through these projects.
  5. Ignore the participants' concerns and continue with the training, following the standard curriculum without addressing their questions about resource allocation.

Правильный ответ 4. Provide examples of organizations that have successfully implemented Green Belt projects and demonstrate the return on investment and process improvements achieved through these projects.

Certified Six Sigma Coach Test Questions

Вопрос 81

  1. Engage in one-on-one discussions with the resistant workers to understand their concerns, address their fears, and involve them in the improvement process.
  2. Ignore the resistance and focus on implementing the project plan as initially designed to meet the project deadlines.
  3. Conduct a series of training sessions for all workers, emphasizing the benefits of the Six Sigma improvements and how it will positively impact their jobs and the company.
  4. Replace the resistant workers with more cooperative individuals to ensure the project's success and adherence to the Six Sigma principles.
  5. Convene a meeting with top management to convince them to force the resistant workers to comply with the Six Sigma changes for the greater good of the company.

Правильный ответ 1. Engage in one-on-one discussions with the resistant workers to understand their concerns, address their fears, and involve them in the improvement process.

Вопрос 82

  1. Implement the changes without seeking the input of the medical staff, as the improvements are data-driven and evidence-based.
  2. Hold a meeting with the medical staff to explain the changes and their positive impact on patient care and ER efficiency, while also listening to their concerns and suggestions.
  3. Escalate the issue to hospital management and request that they enforce the changes, even if it means overruling the medical staff's objections.
  4. Provide additional training to the medical staff on the Six Sigma methodology and tools, emphasizing the benefits of process improvement in healthcare.
  5. Replace the medical staff with individuals who are more open to change and Six Sigma principles to ensure compliance with the improvement plan.

Правильный ответ 2. Hold a meeting with the medical staff to explain the changes and their positive impact on patient care and ER efficiency, while also listening to their concerns and suggestions.

Вопрос 83

  1. Implement a top-down approach where you create standardized inventory management procedures and enforce them across all retail locations without seeking input from local store managers.
  2. Collaborate with local store managers to develop standardized inventory management processes that take into account the unique challenges and needs of each location.
  3. Replace the store managers with individuals who are more inclined to follow standardized processes and guidelines without question.
  4. Hold additional training sessions for store managers to educate them on the benefits of Six Sigma and the importance of standardized inventory control procedures.
  5. Report the issues to the executive team and recommend closing down underperforming retail locations to reduce the complexity of inventory management.

Правильный ответ 2. Collaborate with local store managers to develop standardized inventory management processes that take into account the unique challenges and needs of each location.

Вопрос 84

  1. Implement a top-down directive to enforce communication protocols between the loan processing team and the customer service team, without seeking their input or involvement.
  2. Facilitate regular meetings and collaboration between the loan processing and customer service teams to establish clear communication channels, share feedback, and jointly develop effective communication procedures.
  3. Replace team members who are responsible for communication with individuals who are more inclined to follow established procedures without question.
  4. Organize a training program for team members, highlighting the importance of Six Sigma principles in the loan approval process, and emphasizing the need for clear communication practices.
  5. Report the issues to senior management and recommend outsourcing the customer service function to a third-party company to remove the communication burden from the loan processing team.

Правильный ответ 2. Facilitate regular meetings and collaboration between the loan processing and customer service teams to establish clear communication channels, share feedback, and jointly develop effective communication procedures.

Вопрос 85

  1. Implement strict rules and procedures that require the development and testing teams to communicate and collaborate, with penalties for non-compliance.
  2. Organize regular joint meetings between the development and testing teams to encourage open communication, sharing of feedback, and mutual problem-solving, and jointly develop effective collaboration practices.
  3. Replace team members in both teams who are resistant to collaboration and have a history of poor communication.
  4. Hold mandatory training sessions for team members on Six Sigma principles and the significance of cross-functional collaboration in software development.
  5. Report the issues to senior management and suggest outsourcing the testing function to an external company to avoid internal collaboration challenges.

Правильный ответ 2. Organize regular joint meetings between the development and testing teams to encourage open communication, sharing of feedback, and mutual problem-solving, and jointly develop effective collaboration practices.

Вопрос 86

  1. Implement a top-down directive to enforce strict training and work instruction procedures without involving the operators in the decision-making process.
  2. Work closely with the operators to develop comprehensive training programs and standardized work instructions that meet their needs and are based on their experience and insights.
  3. Replace operators who struggle with following standardized work instructions and provide training to new employees who are more likely to adhere to the established procedures.
  4. Hold training sessions for operators on the principles of Six Sigma and the importance of following standardized work instructions, without involving them in the development process.
  5. Recommend outsourcing the manufacturing process to a third-party company with a strong quality assurance track record to address the product quality issues.

Правильный ответ 2. Work closely with the operators to develop comprehensive training programs and standardized work instructions that meet their needs and are based on their experience and insights.

Вопрос 87

  1. Implement a top-down directive to enforce standardized customer support procedures without seeking input or collaboration from the support team.
  2. Facilitate regular meetings and collaboration between the customer support team and the product development team to establish clear communication channels, share feedback, and jointly develop effective procedures for handling complaints.
  3. Replace team members in both the support and development teams who are resistant to collaboration and communication, and hire individuals who are more cooperative.
  4. Hold mandatory training sessions for the customer support team on Six Sigma principles and the importance of standardized procedures in handling complaints.
  5. Recommend outsourcing the customer support function to a third-party company with a better track record in handling complaints to resolve the customer satisfaction issues.

Правильный ответ 2. Facilitate regular meetings and collaboration between the customer support team and the product development team to establish clear communication channels, share feedback, and jointly develop effective procedures for handling complaints.

Вопрос 88

  1. Implement a top-down directive to enforce standardized claim processing procedures without involving employees in the decision-making process.
  2. Work closely with employees to develop comprehensive process documentation and standardized work instructions that meet their needs and are based on their experience and insights.
  3. Replace employees who struggle with following standardized work instructions and provide training to new employees who are more likely to adhere to established procedures.
  4. Hold training sessions for employees on the principles of Six Sigma and the importance of following standardized work instructions, without involving them in the development process.
  5. Recommend outsourcing the benefit claims processing to a third-party company with a strong track record in claims processing to address the backlog and error rate issues.

Правильный ответ 2. Work closely with employees to develop comprehensive process documentation and standardized work instructions that meet their needs and are based on their experience and insights.

Вопрос 89

  1. Implement a top-down directive to enforce standardized preventive maintenance procedures without involving maintenance technicians in the development process.
  2. Collaborate with maintenance technicians to develop comprehensive preventive maintenance procedures and provide training that meets their needs and is based on their experience and insights.
  3. Replace maintenance technicians who struggle with following standardized procedures and hire individuals who are more likely to adhere to established preventive maintenance processes.
  4. Hold mandatory training sessions for maintenance technicians on Six Sigma principles and the importance of following standardized preventive maintenance procedures, without involving them in the development process.
  5. Recommend outsourcing equipment maintenance to a specialized company to address the reliability issues and reduce internal maintenance costs.

Правильный ответ 2. Collaborate with maintenance technicians to develop comprehensive preventive maintenance procedures and provide training that meets their needs and is based on their experience and insights.

Вопрос 90

  1. Implement a top-down directive to enforce standardized enrollment procedures without involving enrollment staff in the development process.
  2. Work collaboratively with the enrollment staff to develop comprehensive enrollment procedures and provide training that meets their needs and is based on their experience and insights.
  3. Replace enrollment staff who struggle with following standardized procedures and hire individuals who are more likely to adhere to established enrollment processes.
  4. Hold mandatory training sessions for enrollment staff on Six Sigma principles and the importance of following standardized enrollment procedures, without involving them in the development process.
  5. Recommend outsourcing student support services to a specialized company to address student retention issues and reduce internal costs.

Правильный ответ 2. Work collaboratively with the enrollment staff to develop comprehensive enrollment procedures and provide training that meets their needs and is based on their experience and insights.

Записаться на сертификацию

Мы гарантируем, что вы сдадите экзамен на сертификацию Six Sigma с помощью бесплатного онлайн-обучения!

  1. 01

    Запишитесь онлайн

    Выберите аккредитованную сертификацию и завершите регистрацию.

  2. 02

    Получите код доступа

    Персональный код доступа к экзамену сразу придёт на электронную почту.

  3. 03

    Подготовьтесь и сдайте экзамен

    Пройдите бесплатное обучение и ответьте онлайн на 50 вопросов с выбором ответа.

  4. 04

    Получите бессрочную сертификацию

    Получите сертификат, действительный во всём мире, и цифровой значок, подлинность которого можно проверить.

Образец Certified Six Sigma Master Black Belt™ (CSSMBB™) Certification
Записаться на сертификацию

ВАШЕ БЕСПЛАТНОЕ ПРЕМИАЛЬНОЕ ОБУЧЕНИЕ ОНЛАЙН

Ваша книга Six Sigma Revealed, второе издание, готова.

Мы создали ваше обучение вместе с консорциумом известных руководителей компаний и команд, коучей Six Sigma, наставников, экспертов и авторитетных специалистов из всех основных отраслей. Обучение доступно всем посетителям International Six Sigma Institute™. Материалы можно найти в разделах Ваша бесплатная книга по Six Sigma и Ваше бесплатное обучение премиум-класса по Six Sigma в главном меню.

Эти материалы являются интеллектуальной собственностью International Six Sigma Institute™ и защищены авторским правом. Мы бесплатно делимся ими со всеми, поскольку передача наших знаний помогает специалистам Six Sigma и способствует развитию этой области.

Ваш сертификационный экзамен состоит из вопросов с вариантами ответов. Изучите онлайн-материалы, чтобы получить знания, необходимые для сдачи экзамена и получения сертификата Six Sigma.

Мы гарантируем, что вы сдадите экзамен на сертификацию Six Sigma с помощью бесплатного онлайн-обучения премиум-класса!

Сотни тысяч специалистов добились успеха с нашими сертификатами по тестированию ПО!

НАШЕ СООБЩЕСТВО ПАРТНЁРОВ

Обучение объединяет людей.

Группа студентов нашего партнёра MicroTrain Technologies в Чикаго
MicroTrain Technologies · Чикаго, США

Поздравляем нашего партнёра MicroTrain Technologies из Чикаго, США, и его слушателей с успешным прохождением обучения и сертификации Certified Six Sigma Green Belt (CSSGB)!

Прочитать историю партнёра ↗Наша программа корпоративного партнёрства